Click to Home
Go To Search
Facebooke-News Sign Up
Twitter
2014 Road Construction
Road construction throughout the City 
The City of Burlington is planning the 2014 construction season. Work includes the following projects:

Cedar Drive
Asphalt pavement will be resurfaced from Karyl Street to Bear Meadows Subdivision with spot repairs to the curb and gutter.

Karyl Street
Asphalt pavement will be resurfaced from Cedar Drive for approximately 740 feet with spot repairs to the curb and gutter.

Joseph Court

Asphalt pavement will be resurfaced on the entire road with spot repairs to the curb and gutter.

Bridge Street
Asphalt patching, crack filling and slag sealing from E. Chestnut Street to Adams Street.

McCanna Parkway
Asphalt patching, crack filling and slag sealing on the entire road.

Brookview Avenue
Asphalt patching, crack filling and slag sealing from Industrial Drive to dead end.

Industrial Drive
Asphalt patching, crack filling and slag sealing from Brookview Avenue to Krift Avenue.

Krift Avenue
Asphalt patching, crack filling and slag sealing from Industrial Drive to dead end.

Longmeadow Drive
Asphalt patching, crack filling and slag sealing on the entire road.

Sidewalk Reconstruction
Sidewalks will be replaced at various locations around the City.


Residents seeking additional details can call the Department of Public Works at 262.342.1181.